Budget/Credits
Research & Labor
- 3 People 20 hours/week for 40 weeks - 48000
- Industrial Designer for 20 hours (@100/h) - 2000
- Construction labor (via a contractor) - 5000
- Average work hour calculated as 60
- 11800
Equipment
- Misc. RF research - university resource
- A computer tha would work as brain of the system. - 2500
- Three video cameras - 1500
- Misc. testing supplies - 300
- Visual DSP++ - 2625 (University Resources?)
- Paging channel analysis software
- 6925
Development
- Base Tower Physical Construction:
- Mount, location construction - Site Dependant
Materials
- DSP Processor (ADSP-TS101SAB1-000) - 400
- Antenna - 100
- Connectivity (Serial Devices) - 30
- Misc. and Fabrication - 400
- Large aluminum sheets, piano strings, wood blocks, etc. - 2000
- Boards, chips and cotrollers to trigger the instruments. - 1500
- Pipes & reflectors - 500
- Polyester & epoxy resins for 6 seats + extras - 500 PVC - 1500
- LED arrays (aprox 1500 p/seat) total - 9000
- 17430
Misc
- Cables, books, journals, tools, etc. - 5000
- 5000
Total (all prizes in us-dollar) 55000
Concept
- Jorge Castellanos, Anne Pascual, Will Wolcott
Development
- Jorge Castellanos (Sound)
- Anne Pascual (Visual Objects)
- Will Wolcott (Tracking Device)
- wave spot - a project by Jorge Castellanos, Anne Pascual, Will Wolcott